| |
|
Community Hall Samples
Newbury
Hall |
| Site: |
Newbury,
Palmerston North |
| Wastewater
Volume: |
6300
litres per function |
Wastewater Design:

|
When
the Newbury Hall was shifted across the road next to the Newbury
School, it required a new effluent system. To avoid using
too much land for effluent disposal, I designed a timer controlled
LPED dosing system which held the peak flow in a 'Uniclear'
25,000 litre septic tank fitted with an OSI pump vault which
slowly dosed the filtered effluent into a 100 square metre
disposal area at a rate the ground could absorb and treat. |
Flemington
Hall (1998) |
| Site: |
Flemington
Community Hall and School in Central Hawkes Bay |
| Wastewater
Volume: |
Hall 5000
litres per function
School 3500 litres per day |
|
Wastewater Design:

|
The
lack of a disposal area within the hall and school grounds
required a full sewage to clearwater sewage treatment system.
I was appointed Project Manager by the Ministry of Education
to undertake all work related to this project. Designed and
obtained Regional Council consent for sewage treatment and
discharge of effluent to constructed wetlands. |
| |
|
|
|
|