Marae


Te Ti Kanga Marae

2 x 25000 litre 'Uniclear'™ septic tanks in position.
The tanks weigh 14 tonnes each

Septic tank holes being dug. Note sand base for tank installation

 

EFFLUENT DISPOSAL
This steep pine plantation was the only area available for effluent disposal as all the other areas were too wet in the winter or had high traffic flows during Tangi's. However the steep bank also presents the problem of erosion if the effluent is not evenly spread out over a large area, in this case 2000 square metres. Raam, pressure compensating, trickle irrigation tubing was used through the disposal area.
The effluent quality must be very high (like tap water) before Raam can be used and only the Orenco Natural Biological sand contractor can consistently produce this quality of effluent. Wastewater designs are best done by considering the effluent disposal area, soil type, application rate and then designing the treatment system from there.

 

Tanks underground - contactor underground behind tanksArea to be grassed and mowed. The protruding pipes are carbon vents to prevent any odours leaking into the air. After installation they will be cut down to reduce visual obstruction.
  

Front view of meeting house

 


DAVE MILLER

Environmental Engineer